Zhuzhou Jinxin Cemented Carbide Group Co.,Ltd

Home > Products > Wear Plate and Cutting Ring for Concrete Pump > Concrete Pump Spectacle Wear Plate & Wear Ring

Concrete Pump Spectacle Wear Plate & Wear Ring

Brand Name : JINXIN

Place of Origin : CHINA

MOQ : 10sets

Packaging Details : Standard carton/pallet/plywood case

Delivery Time : 7-15 days depending on qty and design

Supply Ability : 1000000kg/month

Matierial : Tungsten carbide

Type : All

Application : Concrete pumps of Putzmeister/Schwing/Sermac/Sani/Zoomlion/Cifa/Kyokuto/IHI/Kcp/Junjin/Everdigm & shotcrete pumps/guncrete machines/ wet sprayers of Putzmeister/Schwing/Jacon

High density Good machinability High modulus of elasticity Strong corrosion resistance Non-poisonous ,no pollution Good mechanical properties

Factory Wholesale Tungsten Carbide Concrete Pump Spectacle Wear Plate & Wear Ring  


Features:

HRC: ≥ 63°

Carbide HRA:   ≥ 86°

Bending strength: >2500N/mm²

Material:Tungsten carbide,Q2358 steel; VAUTID-150 electrode imported from Germany.

Service Life: According to using different types of wear plate, Service life has some differenl, about 30000--60000CBM

Types: DN200,DN230 , Wear-resistant castings ; Holistic tungsten carbide; “L”Shape tungsten carbide; Doubletungsten carbide ring ; Double tungsten carbide ; Tungsten carbide.


ModelWear PlateCutting Ring
Suitable pump typeDiameterLengthWidthOutside DiameterInside Diameter
(mm)(mm)(mm)( mm )( mm )
PMTrailer-mounted concrete pump190570320260190
Trailer-mounted concrete pump220570340282220
Truck-mounted concrete pump220560308283217
ZoomlionTrailer-mounted concrete pump195590330261190
Truck-mounted concrete pump220630372283220
Truck-mounted concrete pump225630372293225
Truck-mounted concrete pump235690390310235
SanyTrailer-mounted concrete pump192580355264192
Truck-mounted concrete pump225630383295225
Truck-mounted concrete pump235640430315235
SchwingTrailer-mounted concrete pump178534302262195
Trailer-mounted concrete pump195534302262195


Production process:

Concrete pump plate


The Role of Jinxin High Quality Carbide Plate:

 1. Ensure correct position.

 There is a cutting effect on the aggregate between the cutting ring and the wear plate of the concrete pump truck, so as to ensure that the cutting ring and the wear plate are correctly in place.

 2. Improve the sealing.

Because there is a rubber compression ring between the cutting ring and the S valve it plays a cutting ring to wear plate a pre-pressure, so as to improve the sealing between the cutting ring and the wear plate.

 3. Reduce the cost of use.

It will be the S valve inlet and cylinder outlet wear replaced by the wear between wear plate and the cutting ring. Thus the cost of replacing a set of wear plate and cutting ring is much lower than the cost of replacing S valve and material cylinder.

       

Packing and delivering:

Concrete pump ring


About us:

Wear plate for concrete pump

Please feel free to give your inquiry in the form below. We will reply you in 24 hours.
Message